What a derate looks like in a weekly plant activity nowcast

A derate is a plant running below its rated capacity: the unit stays synchronized to the grid, still burning fuel, still generating, just at a reduced level. A forced outage is the unit coming offline entirely, usually without warning, usually because something broke. A 300 MW derate on a 600 MW coal unit pulls half a unit's worth of capacity out of the supply stack. A full trip pulls the whole thing, and a dispatch curve built on the wrong one of those two numbers is wrong by a factor of two.
From the control room, that difference is obvious. From a weekly imagery feed, it's a matter of degree, and that's where most of the interpretation work happens.
What a derate does to the signal
Stack plume reads smaller on a derate, not gone. A unit running at 60% of nameplate still shows thermal output and vapor off the cooling tower, just scaled down from its full-load values. A forced outage reads differently: the plume thins toward nothing, cooling-water discharge temperature at the outfall drifts toward ambient, and on some units the stack goes cold within a day or two of the trip.
Coal pile volumetrics move on a slower clock. A derated unit still burns fuel, just less of it, so the pile draws down at a reduced rate rather than flattening out. A unit that's fully offline stops drawing the pile almost entirely, and if the outage runs long, deliveries can start outpacing burn and the pile grows week over week.
Reading any one of these signals in isolation can mislead you. The combination, checked against what that specific plant normally looks like, is what narrows a derate down from an outage.
Why the baseline matters more than any single week
A nowcast series only means something next to a plant's own history. A 500 MW gas unit that's held a steady 70% capacity factor for six months has an established plume size, discharge temperature, and pile-draw rate to compare each new week against. A dip below that baseline that still shows real heat and real water flow reads as a derate. A dip that flattens plume, discharge, and pile draw all at once reads as an outage.
Seasonal dispatch patterns complicate the read if you're not careful. A unit running a lower capacity factor in April because economics favor gas over coal that month is getting called on less often, not derated. The imagery signature can look similar, because both show less than full load, but one is a market decision and the other is a unit limitation. Imagery alone won't sort the two apart. Cross-checking against generation data and known dispatch patterns for the plant will.
Why this beats waiting on the paper trail
NERC GADS reporting and EIA-923 filings will eventually confirm a derate and its duration, but they lag by weeks or months. By the time a filing shows a unit ran at partial load through October, the fuel burn and basis implications of that derate have already worked through the market. A weekly imagery read on a named plant's stack and cooling-water activity gives you a contemporaneous signal to chart against generation and fuel data, instead of a record to reconcile after the fact.
Power Plant Activity builds that weekly signal plant by plant, combining stack and cooling-water signatures with coal-pile volumetrics so a derate shows up in the series the same week it happens rather than in a filing months later.
If you're tracking a specific plant's dispatch pattern against fuel and generation data, get in touch about adding it to the nowcast.