What is heat rate, and why does it drive dispatch nowcasts?

A power plant's cooling towers releasing a large white steam plume under a dramatic cloudy sky.

Heat rate is the fuel input a unit burns to make one kilowatt-hour of electricity, usually stated in Btu/kWh. A new combined-cycle gas unit might run around 6,400-7,000 Btu/kWh at full load. An older coal steam unit might sit closer to 10,000-11,000. Lower is better. It's the single number that converts a fuel price into a cost of generation, which is why it sits at the center of every dispatch model an analyst builds.

The math itself is simple: divide total fuel input (in Btu) by net electrical output (in kWh) over some period. The complication is that heat rate isn't fixed. It changes with load, ambient temperature, equipment condition, and how long the unit has been running since its last start. A unit that looks efficient on its design spec sheet can run meaningfully worse at 40% load on a hot August afternoon.

Heat rate sets the merit order

Grid operators dispatch generation in merit order, cheapest marginal cost first, until load is served. Marginal cost for a thermal unit is basically heat rate times fuel price, plus variable O&M.

That's why a coal plant with a 9,500 Btu/kWh heat rate and cheap coal can out-dispatch a gas peaker with a better heat rate but pricier fuel, and why the ranking flips when gas basis moves. Heat rate is also the number behind spark spread and dark spread calculations: power price minus (fuel price times heat rate) tells you roughly what a unit earns per megawatt-hour it runs. When that spread goes negative, the plant should sit idle. When it widens, the plant should run harder. Analysts use this relationship constantly to build forward dispatch expectations.

Where the model and the plant disagree

The problem is that the heat rate in your model is an assumption, and the plant is a physical object that doesn't always cooperate with it. A unit cycling on and off to chase price spikes burns extra fuel on startup that your steady-state heat rate number doesn't capture. A plant running at minimum load to stay synchronized, rather than shutting down entirely, looks "off" in a capacity factor sense but is still burning fuel and emitting at a heat rate far worse than nameplate. None of that shows up until EIA-923 fuel data or a utility's monthly disclosure lands, often a month or more after the fact.

That's the gap for anyone trying to nowcast dispatch rather than reconstruct it after the fact. A spark-spread model can tell you a unit should be running this week. It can't tell you whether the plant actually fired up, throttled back, or stayed dark while its owner worked around a forced outage nobody disclosed yet.

A physical check on the fuel-price model

This is the gap a weekly imagery read is built to close. A stack plume that's persistent and hot, a cooling tower putting off steam at a rate consistent with full load, a coal pile that's visibly drawing down week over week: these are physical confirmations that a unit is running, independent of whatever your heat rate assumption says it should be doing. Power Plant Activity turns those signatures into a weekly nowcast for a named plant, something you can chart directly against your spark-spread or dark-spread model instead of waiting on the next EIA filing to find out if your dispatch assumption was right.

None of this replaces a proper heat rate curve or a fuel-cost model. It's a way to check, on a weekly cadence, whether the unit you're modeling is doing what the economics say it should.

Treat heat rate as the bridge between a fuel price and a dispatch decision, and treat an activity signal as the check on whether that bridge held up this week.